Government Land given for Possession
Filter Document category wise
Title | Date | View / Download |
---|---|---|
Regarding the acquisition of 0.17.02 river area in Mouje Shirgaon, Taluka Vasai for the doubling of the railway line between Virar and Dahanu. | 01/08/2025 | View (879 KB) |
Regarding the acquisition of land measuring 0.25.46 hectares in Mauje Shigaon, Taluka Palghar for high-speed rail. | 01/08/2025 | View (887 KB) |
Regarding the acquisition of land 0.48.88 hectares in the village area of Mauje Shigaon, Taluka Palghar for the high-speed railway. | 01/08/2025 | View (2 MB) |
Regarding the land survey number 130 A located in Mauje Vewoor, Taluka Palghar for high-speed railway acquisition. | 01/08/2025 | View (1 MB) |
Regarding the acquisition of land no. 120 in Mauje Vevur (Gholvira), Tal. Palghar for high-speed railway. | 01/08/2025 | View (1 MB) |
Regarding the land survey number 375-1 at Mauje Virar, Taluka Vasai for obtaining land for the high-speed railway. | 01/08/2025 | View (1 MB) |
Land parcel no. 60-A-6 of mouje-Virathan Khurd, Taluka: Palghar, with a total area of 54.48.0 hectares, out of which an area of 4.04.36 hectares is being provided for the Mumbai-Ahmedabad high-speed railway project. | 01/08/2025 | View (410 KB) |
Regarding the acquisition of land S.No. 60-A at Mauje Virathan Khurd, Taluka: Palghar for high-speed railway. | 01/08/2025 | View (2 MB) |
Regarding the acquisition of land measurement number 0.01.26 H.R. in Mauje Virathan Khurd, Taluka Palghar for the high-speed railway. | 01/08/2025 | View (847 KB) |
The land area 0.02.12 hectares in Mauje Walve, Taluka Palghar, regarding the acquisition for the Mumbai-Ahmedabad High-Speed Rail. | 01/08/2025 | View (2 MB) |